Recovered Carbon Black Production Line in India
Project Overview

Client: Tyre Pyrolysis Plant in Gujarat
Commissioning Date: March 2023
Key Objective: Establish 8TPH recovered carbon black (rCB) production line meeting ASTM D8178 standards with ≤5μm D97 particle size
InquirySystem Highlights
- Closed-loop design with nitrogen protection system
- Multi-stage precision classification system
- Real-time particle size monitoring (Laser PSA)
- Dust emission ≤10mg/Nm³
Performance Data
-
Annual Capacity: 42,000 metric tons
-
Specific Energy Consumption: 18.7kWh/ton
-
Product Consistency: D50=2.8μm ±0.3μm
-
System Availability: 96.5%
Core Equipment: XZM224 Ultrafine Mill
Processing Capacity | 0.8-6.5 ton/h |
Power Consumption | 90kW |
Input Size | ≤20mm pyrolyzed carbon |
Output Fineness | 325-2500 mesh (D97≤5μm) |
Energy Saving | 30% lower vs conventional mills |